BUILD SPECS
SQ. FT.
TIMEFRAME
LOCATION
BUILD TYPE
STRUCTURE
DETAILS
1,2OO
30 days
SSI
restoration
post + beam barn
deconstructed barn, rot repair, exterior facelift
This restoration was stripped down to its original posts + beams. We carefully replaced the rotten ones + increased structural soundness with framing. All-new siding + roof was installed.
All while achieving the tight deadline at hand of 30 days.